Fairway Academy
  • Home
  • About
  • form testing page

Categories

  • Embedded Systems
  • General
  • Hydronic Heating
  • OpenOCD
  • Saab Tricks
  • Uncategorized

Blogroll

  • BEC Systems
  • Dunkirk Metal Products
  • OpenOCD Quick Ref Card
  • Tea from Malaysia
  • Wordpress Documentation
  • Wordpress Support Forum

Recent Posts

  • SAAB 9000 Central Locking Repair
  • Spring 2014
  • Welcome to end of Summer 2013
  • Saab 9^5 HVAC Recirculation Air Motor Repair
  • Saab 9000 Belt Tensioner Compression Tool

Recent Comments

    Tags

    4 7 9000 belt tensioner Add new tag Blu-ray boiler maintenance capacitive touch CD circulator controls control strategy DVD heat transfer calculations hot water storage Hydronic Heating Microchip 16F883 Microchip low voltage programming OpenOCD OpenOCD and PXA255 PIC sleep entry PXA255 PXA255 SDRAM initialization PXA Open OCD memory init script QT1081 radiant heating Saab 9^5 HVAC Saab 95 broken recirculation arm Saab 95 recirculation Saab 9000 tool SDRAM initialization touch panel variable speed circulator wood fired boiler wood gasification boiler wood heat

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Archives

    • May 2014
    • April 2014
    • February 2011
    • August 2010
    • February 2010
    • October 2009
    • May 2009
    • March 2009
    • February 2009
    • January 2009
    • December 2008
    • November 2008
    • September 2008
    • August 2008
    • July 2008
    • February 2008
    • December 2007
    New Heating System, One Year Later
    Posted on October 29, 2009 in Hydronic Heating by adminComments Off on New Heating System, One Year Later

    Well, it’s that time of the year again.  The weather is cooling off and we’ll have to begin the heating season once again.  The performance of the wood boiler has been very good, although with last winter being colder than normal we ended up using about 6 cords of wood between October 2008 and June 2009.  Operationally we’ve made very few tweaks to the control system software, and the variable speed circulator that controls the storage tank loop has proven to be magic.  PID tuning of its control loop was pretty easy, and if I wasn’t doing more monitoring and research, the control system could be greatly simplified, reducing it to something any HVAC technician or homeowner could maintain. Using  just thermostats and a couple relays, and one of those little PID controller 1/4 DIN modules from Automation Direct would be enough.  There have been no issues with reliability, everything has worked as designed.  Also, when I took a water sample from the boiler drain at the end of the heating season, it came out crystal clear, thanks to maintaining a system fluid pH of about 8.5.

    I can’t emphasize enough the importance of maintaining the proper pH level of the water in the system, since this is responsible for ensuring long system life and minimizing any corrosion problems.  Many hydronic systems are severely neglected regarding this.  A friend of mine who installs geothermal systems reports that since he started raising the pH of the water in the ground loops and heating loops of the systems he installs this has virtually eliminated problems with rust and corrosion.

    -Jeff

    Comments are closed.

    Theme by Got Chance and Nitrogen DesignsPowered by Wordpress